THE SHORT ANSWER
KUA’s application page identifies homeowner signatures on pages 3, 13 and 19 and uses the prerequisite wording “Notice of Commencement/Issued permit status.” [1] Confirm the required evidence for your project with KUA; do not assume a notice alone replaces an issued permit or that a submitted permit is already approved.
Identify the provider and the actual permit record
Start with the utility named on the electric bill and the authority responsible for the property’s permits. A Kissimmee or Orlando mailing address is not enough to identify either one. This guide applies to a KUA electric account; Origin confirms coverage and scope for the exact address before accepting work.
Ask the contractor for the permit number, jurisdiction, address and current status evidence. Distinguish an application receipt from an issued permit and distinguish both from a completed final inspection. Keep the date of the status check alongside the record. If the project team uses an abbreviation or says the job is approved, ask which authority approved what. A specific answer makes it possible to identify the next action without guessing from a payment receipt.
Resolve the prerequisite rather than choosing an interpretation
The slash in the utility’s published wording should not become an informal permission to skip a required step. Ask the submitting contractor to verify what KUA expects for this address and application, particularly when the permit record or notice is still being processed. Keep the response with the packet and identify who owns any missing item.
Hypothetical example: a homeowner has a filed notice and a permit portal that still says under review. Instead of marking the utility application ready from the notice alone, the contractor asks KUA which status evidence is acceptable and checks the permitting record separately. The homeowner’s log records the unresolved issue and next follow-up. This example illustrates careful coordination, not an interpretation of legal notice requirements or an exception to permitting.
Read the current form before using a signature checklist
Download the current packet from the utility’s official page and record its filename and date. Use the page positions stated in the current instructions as a check, then read the headings and obligations surrounding each signature. Page numbering can change when a form is revised or combined with supporting files. A saved screenshot of an old signature box should not control a new submission.
Ask the responsible party to explain any incomplete equipment, customer or project fields before you sign. Do not sign a blank version with an assurance that the details will be filled in later. If the signer’s role or account name does not match the requested form, resolve the discrepancy with KUA rather than assuming a spouse, manager or sales representative can sign in the required capacity.
Keep a signature attached to the version reviewed
Create a small document register listing the form, revision date, person responsible, signature status and open question. Save the complete signed file, not only the signature page. If equipment or ownership changes afterward, ask which documents and signatures must be updated and keep the earlier set clearly marked as superseded.
For example, replacing a module model can alter more than the equipment description. The designer should explain whether other application inputs change, and the submitter should identify any required refreshed approval. A homeowner need not solve the engineering question to insist that the final record accurately describes the accepted project. Avoid manually combining a signature from one version with terms from another merely to make the packet appear complete.
Close the readiness check without promising activation
Before submission, ask for one current packet and a short list of any remaining exceptions. After submission, save the confirmation or correspondence identifying what was received and when. A readiness checklist documents preparation; it does not prove utility acceptance, successful inspection, meter completion or permission to operate.
Keep private account numbers, signatures and supporting records in the agreed secure channel. A general callback message needs only the project question, not the entire application or utility password. For a first Origin conversation, describe the missing milestone and the provider. The team can clarify its supported role for your property while KUA and the permitting authority retain responsibility for their decisions. No checklist can guarantee a completion date before those decisions are made.
Before your next conversation
- Confirm KUA and the correct permitting authority for the property.
- Resolve the current prerequisite wording with the responsible submitter.
- Read the complete current packet before signing.
- Retain one accurate signed submission set and its receipt.
Primary sources
- KUA: Net Metering application process
Checked October 19, 2026 for the published prerequisite wording and signature-page instructions. Confirm the current packet and project-specific evidence with KUA.
Planning examples and questions are Origin’s editorial guidance, not a property-specific diagnosis, engineering design, tax determination or promise of savings. Manufacturer and utility references do not imply an affiliation with Origin.
Make the decision specific to your home.
Bring your permit-status question and packet checklist to an Origin Direct review. Keep private signed documents out of general callback notes.
Request an Origin Direct quote →Scope, pricing and availability are confirmed for your property. A request is not a confirmed appointment.
Related guidance
- Reconcile the three KUA application documents
- Separate final inspection, meter work and PTO
- Review address-qualified Orlando services