UTILITY DECISIONS · 2 MIN READ

FPL says to start net metering before installing solar—what should you verify?

FPL’s published sequence begins with preapproval. Keep the proposed equipment, tier and account details stable through design, installation and final review.

THE SHORT ANSWER

FPL instructs customers to begin a net-metering application and obtain preapproval before installing, then sign the agreement, complete tier-specific requirements and return the finished application for review and meter work. [1]

Confirm the account owner

Use the name and service address on the active FPL account. Decide who is authorized to receive application notices and keep the login with the homeowner’s project records. A contractor portal can support the process, but the customer should still know the application reference and current status.

Freeze the proposed system identity

Record module count, module rating, inverter model, storage and gross power rating in the preapproval package. If the sales proposal changes later, ask whether FPL needs a revision. A product described as “equivalent” may alter capacity or certifications even when the contract price stays the same.

Separate preapproval from permission to operate

Early approval allows the project to proceed under FPL’s sequence; it is not the final authorization to energize or export. Permits, inspection results, completed tier documents and FPL meter work still follow. Avoid scheduling promised savings from an installation date alone.

Track returned corrections precisely

If the application is returned, save the full notice and assign each item to the designer, installer, insurer or homeowner. “Utility delay” is not a useful status when a missing signature or revised one-line is waiting on the project team. Resubmit a controlled document set with matching revision dates.

Close with evidence

Retain the signed agreement, final permit, approved equipment schedule and the utility’s activation notice. Verify that the installed labels match the record. Origin Direct can explain the intended sequence and scope, while FPL controls its application and meter decisions for the account.

Before your next conversation

  • Record the FPL application reference.
  • Keep equipment and tier consistent across revisions.
  • Do not confuse preapproval with final operating permission.

Primary sources

  1. FPL: Net Metering FAQs

    Primary reference checked September 9, 2026. Confirm current requirements with the named utility, manufacturer or authority for your property.

Planning examples and questions are Origin’s editorial guidance, not a property-specific diagnosis, engineering design, tax determination or promise of savings. Manufacturer and utility references do not imply an affiliation with Origin.

Make the decision specific to your home.

Use Origin Direct to review the application sequence before installation dates become commitments.

Book an Origin Direct review

Scope, pricing and availability are confirmed for your property. A consultation does not establish utility or incentive approval.

Related guidance

Browse all 25 guides in this collection →