BATTERIES & BACKUP · 2 MIN READ

Adding storage on SECO Energy: define the battery operating mode

Document charging, export, backup and transfer behavior before choosing equipment or modifying an existing solar system.

THE SHORT ANSWER

A battery proposal should explain how storage interacts with the grid, solar array and backed-up circuits. Confirm the applicable SECO and permit process for that configuration.

Describe normal operation

State whether the battery charges from solar, the grid or both; when it discharges; whether export is enabled; and what reserve the owner expects. Keep settings assumptions with the proposal.

Describe outage operation

List backed-up circuits, starting loads, expected simultaneous use and what happens when stored energy is depleted. Solar recharge during an outage depends on compatible design and conditions, not the presence of panels alone.

Update project documents

Show storage, inverter, gateway, transfer equipment, protection and backup panel on the one-line. Match equipment models and operating intent across utility, permit and installation records.

Confirm before installation

Ask SECO and the local authority what reviews apply to the proposed change. Preserve approvals, commissioning results, owner training and supported shutdown instructions.

Before your next conversation

  • Define grid and solar charging.
  • List backed-up circuits.
  • Update the electrical design.
  • Confirm current approvals.

Primary sources

  1. SECO Energy: Net Metering

    Primary source reviewed September 11, 2026. Utility rules, rates, forms and project requirements remain subject to the current account, equipment and property review.

  2. Florida Administrative Code Rule 25-6.065: Interconnection and Net Metering

    Primary source reviewed September 11, 2026. Utility rules, rates, forms and project requirements remain subject to the current account, equipment and property review.

  3. U.S. Department of Energy: Homeowner’s Guide to Going Solar

    Primary source reviewed September 11, 2026. Utility rules, rates, forms and project requirements remain subject to the current account, equipment and property review.

Planning examples and questions are Origin’s editorial guidance, not a property-specific diagnosis, engineering design, tax determination or promise of savings. Manufacturer and utility references do not imply an affiliation with Origin.

Make the decision specific to your home.

Build a critical-load list before requesting a battery design.

Discuss battery options

Scope, pricing and availability are confirmed for your property. A request is not a confirmed appointment.

Related guidance

Browse this guide collection