SECO Energy publishes a net-metering path for member-owned generation. Use the cooperative’s current instructions for the exact service location and retain every submitted record. [1]

Confirm SECO serves the meter

Use the current bill and meter information rather than the city name. Central Florida service territories do not follow every municipal boundary, so a nearby neighbor may have a different utility process.

Create the member record

Match member name, service address and meter identifier across the proposal and application. Ask who may authorize the file if the property is held by a trust, business, estate or landlord.

Assemble the technical set

Keep the one-line, equipment schedule, module and inverter data, storage details and proposed capacity together. Use revision dates so an early drawing cannot be mistaken for the installed design.

Log SECO communications

Save confirmations, correction requests and the final decision with dates and responsible parties. Cooperative membership does not replace permits, contractor duties or equipment-owner obligations.

Before your next conversation

  • Confirm SECO serves the address.
  • Match member and meter records.
  • Version the technical documents.
  • Save every cooperative response.

Primary sources

  1. SECO Energy: Net Metering

    Primary source reviewed September 11, 2026. Utility rules, rates, forms and project requirements remain subject to the current account, equipment and property review.

  2. Florida Administrative Code Rule 25-6.065: Interconnection and Net Metering

    Primary source reviewed September 11, 2026. Utility rules, rates, forms and project requirements remain subject to the current account, equipment and property review.

Planning examples and questions are Origin’s editorial guidance, not a property-specific diagnosis, engineering design, tax determination or promise of savings. Manufacturer and utility references do not imply an affiliation with Origin.

Make the decision specific to your home.

Bring the SECO project file to an Origin Direct review.

Book an Origin Direct review

Scope, pricing and availability are confirmed for your property. A request is not a confirmed appointment.

Related guidance

Browse this guide collection