THE SHORT ANSWER
OEU’s published process places utility field verification after installation and local approval, before final agreement execution and permission to operate. [1]
Review the approved project
Keep the OEU letter, permit inspection, final one-line and equipment schedule available. Confirm the installed system still matches these documents.
Check safe access
Ensure required utility-access areas are unobstructed according to approved plans. Do not open energized cabinets, remove seals or alter labels to prepare for a visit.
Resolve visible discrepancies
Document missing labels, damaged covers, incomplete conduit or model substitutions and assign correction to the qualified party. Avoid cosmetic cover-ups that obscure the actual issue.
Record the outcome
Save visit date, attendees, findings, requested corrections and next OEU step. A completed visit is not automatically the Permission to Operate letter.
Before your next conversation
- Gather approvals and as-builts.
- Maintain safe utility access.
- Resolve documented discrepancies.
- Save the verification result.
Primary sources
- City of Ocala: Renewable Generation System Interconnections Process
Primary source reviewed September 11, 2026. Confirm current utility, permit, equipment and property requirements before relying on a project timeline or design.
Planning examples and questions are Origin’s editorial guidance, not a property-specific diagnosis, engineering design, tax determination or promise of savings. Manufacturer and utility references do not imply an affiliation with Origin.