THE SHORT ANSWER
OEU currently says a net meter is installed approximately two to five business days after its Permission to Operate letter. Verify the actual account and schedule. [1]
Treat the window as approximate
Utility workload, access or project-specific issues can change timing. Do not schedule a guaranteed savings start or contractor payment solely from the published estimate.
Record meter evidence safely
Save OEU notices and the visible meter identifier without removing seals or covers. Note the change date and any brief outage or equipment restart.
Check monitoring afterward
Confirm the solar system and internet gateway return to normal through supported homeowner interfaces. A missing app value may be a communications issue, not a meter fault.
Review the first full cycle
Keep the first complete OEU bill, production export and meter dates. Separate utility import/export values from total solar generation used inside the home.
Before your next conversation
- Confirm the actual meter date.
- Record the meter identifier safely.
- Check supported monitoring.
- Review a full billing period.
Primary sources
- City of Ocala: Renewable Generation System Interconnections Process
Primary source reviewed September 11, 2026. Confirm current utility, permit, equipment and property requirements before relying on a project timeline or design.
Planning examples and questions are Origin’s editorial guidance, not a property-specific diagnosis, engineering design, tax determination or promise of savings. Manufacturer and utility references do not imply an affiliation with Origin.